Making Progress on the Floor

By Joy

We have been focused on getting the floor prepared, and removed the linoleum as well as the ramp.  We decided that one level floor area in the front with a step to access it from the driver’s area was best for us.  Also, David had to replace some of the plywood floor near the area of the former bathroom.

Ultimately, we would love to get bamboo flooring installed, and that is our plan eventually.  For now, we just want something comfortable and safe to walk on, and we will cover the foam layer with some wall-to-wall new carpet remnant we have (bedroom area)as well as large throw rugs.

David has been removing screws and hardware on the side walls to prepare to mount some of the foam there, too.  We will use the seat backs and bottoms, now unattached, as one side of a booth-type kitchen table.

Watch for more updates, including more history, soon.


, ,

categoriaThe Actual Conversion commentoNo Comments dataOctober 25th, 2009

About...

This author published 9 posts in this site.
Part of this bus conversion team of two, Joy is support staff and author, for the most part.

Share

FacebookTwitterEmailWindows LiveTechnoratiDeliciousDiggStumbleponMyspaceLikedin

Leave a comment


Share on Facebook